Case Study

Roseville Fire Protection secure works in Knightsbridge

Roseville Fire Protection secure works in Knightsbridge

Roseville Fire Protection division have secured the works at 55 – 91 Knightsbridge. The team will be completing the Firestopping and Soffit Insulation throughout the Grade II Listed building. The building, which sits above the Piccadilly line, will have a new structure comprising of two underground and six upper storeys. The combination of new and refurbished spaces will provide 6,000…

Read more

Roseville have completed the Fire Stopping at 52 Lime Street

Roseville have completed the Fire Stopping at 52 Lime Street

The Roseville Fire Stopping team have completed their works at the new iconic London building, The Scalpel. Positioned at 52 Lime Street, is a 190m tall, 36 storey building, neighbouring the gherkin. The Lime Street tower will provide approximately 37,000sqm of office accommodation over 35 office floors, plus shops and restaurants. Our Fire Stopping team worked with the Main Contractor…

Read more

The Bower Building – Old Street

The Bower Building – Old Street

Project Title: The Bower Old Street. Project Description: The Bower is a landmark quarter for Old Street, featuring 320,000 sq ft of beautifully designed, modern space and a vibrant restaurant and retail destination. Roseville completed the decorations of the quirky new building in the city.  The team loved working on The Bower, it was designed by award-winning architects AHMM and comprises a collection…

Read more

Roseville start work at the Copse – UOE

Roseville start work at the Copse – UOE

Roseville have started decorations work at The Copse – University of Essex. The Copse is the latest University accommodation for undergraduate students. The new and stylish rooms complement the beautiful surroundings that form the backdrop to these flats. The Copse has 643 new single ensuite rooms and studios that are nestled between The Meadows and the Essex Business School. All rooms…

Read more

Roseville complete Firestopping at 10 Fenchurch Avenue

Roseville complete Firestopping at 10 Fenchurch Avenue

Roseville have recently completed the Firestopping at a new office development for Italy’s largest insurance company Generali. The project, 10 Fenchurch Avenue is a 420,000 sq ft, 15-storey office building which will provide commercial office space, retail use at the lower of the building, and a roof garden. The roof garden will offer panoramic views of London and the square mile, there will…

Read more

Roseville complete decorations at 1 Blackfriars

Roseville complete decorations at 1 Blackfriars

Roseville have been completing the decorations at 1 Blackfriars. One Blackfriars is a new development in London.  At the development’s centre will be a 170m, 50 storey tower, adding to the capital’s skyline and creating a vibrant new place on London’s South Bank. The development is south of Blackfriars Bridge, and will provide 274 homes, a boutique-style hotel, shops and a…

Read more

Roseville decorations team work at Amazon Distibution Centre

Roseville decorations team work at Amazon Distibution Centre

The Roseville decorations team have been working at the Amazon Distribution Centre at Tilbury, completing the internal decorations throughout. The 22m high warehouse building for retail giant Amazon has been built over four floors on a 550,000sq ft floor plate at the London Distribution Park in Tilbury. These levels will be designed in a concrete-framed structure that can be removed at a…

Read more

Fruit & Wool – Case Study

Fruit & Wool – Case Study

Roseville have completed the Painting and Decorating at The London Fruit & Wool Exchange. Creating 260,000 sq ft of offices and 40,000 sq ft of retail in historic Spitafields. The development was sensitively inserted behind the retained façade of the former London Fruit and Wool Exchange on a pivotal corner site. The low rise development consists of a five-storey office building above…

Read more