Roseville Fire have started the fire protection works at Battersea Power Station phase 3. The project is a new build, residential led mixed used development.

Battersea Power Station is an iconic London landmark and one of the last symbols of London’s industrial parts. The redevelopment includes including not only the building itself but also bringing the surrounding areas back to life.

Phase III creates the ‘Electric Boulevard’ which will be the main gateway to the 42-acre development connecting the Northern Line extension station with the power station. This phase also includes building 1300 new homes in a wide range of sizes and styles. There will also be a 160 room hotel, retail space and restaurants.

Two of the world’s major signature architects are involved in this project; the building known as ‘O-1’ has been designed by Foster + Partners and the ‘RS-4’ buildings designed by Gehry Partners. ‘O- 1’.

Roseville Fire team are pleased to be involved in this exciting project ensuring the fire safety throughout the project, from the ground up.

To keep up to date on the project of this progress, follow our Instagram and Twitter.